-
Responsible for the delivery of the overall onshore cable installation project.
-
Managing and overseeing the execution to completion project, directly managing the England section and overseeing and managing as required Scotland elements of the project. Taking into account the specific site characteristics (topography, landscape, environmental and ecological constraints, current infrastructure, sustainability.
-
Manage all Project Health and Safety requirements
-
Manage all Project Environmental requirements
-
Manage and ensure effective support for the adherence to the sustainability performance requirements
-
Manage all Project Progress updates and recording requirements
-
Manage and ensure effective programme planning
-
Prepare, develop and manage, a project Risk Register.
-
Work closely with the design team to produce the best engineering solution for joint bay locations, cable section lengths and pulling locations taking into account logistics and transport requirements.
-
Managing interaction and liaison related to consents, Landowners, Local Planning Authorities and third-party Stakeholders to ensure progression of the planning and consents.
-
Work closely with the wider team to manage and develop any necessary Scope of Works, Division of Responsibilities, Employer and or Client Requirements and Technical Specifications for Onshore Cable works.
-
Interface extensively with the clients offshore cable team to manage the interface of the cable landfall.
-
Actively manage to appointment any required subcontract requirements
-
Work with the wider team to source, review, appoint any such required consultants and/or internal colleagues to develop and carry out pre-condition surveys. Ground investigation including Geological, Geophysical, Archaeology, Thermal Resistivity Ground Investigation, Road condition monitoring, Traffic management, and Temperature surveys, Aboriculturalist investigation and sustainability.
-
Exhibit highly effective coordination and communication with all stakeholders involved in the project, at all levels of the project team and senior management team.
-
Interface, liaison and coordination with any parties responsible for coinciding works, e.g. substation, converter station etc design/build to ensure interface for cable installation is fully understood and planned to ensure successful execution.
-
Work with external recruiters, agencies and internal teams to recruit and maintain/ensure the project has all necessary adequate resources. Prepare Construction Methodology and Site Organisation Chart documentation in line with Project requirements.
-
Organise and chair EGL1 project update meetings with any relevant stakeholder/parties.
-
Ensure effective management of the project resources to ensure efficient and effective execution of their roles and responsibilities, managing both Full Time Employees and indirect employees.