Scope of Work:
- Panel to be shutdown and vented
- Replace 4-off accumulator valve blocks per panel
- Re-make tubing for accumulator valve blocks to system (approx. 6m of tube per panel total)
- Pressure test tube and blow out with nitrogen
- Tie into the panel and re-start
We are looking to do this on 10 out of the 20 panels there are on site. Each panel is on a separate well pad which a few minute’s drive away from each other.
Tooling and material supplied by Proserv and we be brought down by our technician in a van, which will be used to commute between hotel and site each day.
I would like to receive occasional relevant emails from PwE regarding job opportunities and industry updates.
#J-18808-Ljbffr
We invite applications for the Hydraulic Technician position located in Northwich, England, United Kingdom.