A leading utilities provider in the UK is seeking a Project Controller to oversee project control structures and processes. Responsibilities include integrating scheduling, risk management, and cost activities to ensure effective control measures. Ideal candidates will have a degree in a relevant discipline and strong experience in project controls. The position offers flexible and hybrid working arrangements, alongside a competitive benefits package including generous annual leave and a performance-related bonus. #J-18808-Ljbffr We are looking to fill the Project Controls Lead – Schedule, Risk & Cost (Hybrid) position at United Utilities in Warrington, England, United Kingdom. This opportunity is part of our work in Finance. The advertised compensation is 45.000 - 60.000. We aim to respond to suitable candidates as soon as possible. Full responsibilities and requirements are described in the listing above.