LJB & Co is seeking a Logistics Supervisor for a major data centre construction project in Blyth, England. This permanent full-time position requires onsite coordination of site logistics, materials movements and interface with construction teams to keep project timelines on track.
The role offers a salary of £60,000–£70,000 plus benefits and is based on site in Blyth. Experience in mission-critical or data centre logistics is preferred.
#J-18808-Ljbffr
For the On-Site Logistics Lead — Data Centre Construction position at LJB & Co, we are reviewing applications now.
This opportunity is part of our work in Engineering.
The advertised compensation is 60.000 - 70.000.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.
Learn more about the On-Site Logistics Lead — Data Centre Construction role in the description above.