NG Bailey is recruiting an Electrical Planner for the Hinkley Point C project in Bridgwater. You will develop and maintain detailed electrical construction schedules, update four‑week lookahead plans, and ensure progress data is accurate and aligned with programme milestones.
This permanent, site‑based role requires experience on large MEP projects (nuclear preferred), HNC/HND in electrical, and knowledge of Primavera/Asta Powerproject.
#J-18808-Ljbffr
The Electrical Planner – Nuclear Power Project Scheduler position in the Engineering field is open for applications.
Please review the full job details above before applying.
If your experience matches this role, we encourage you to apply.
All applications are reviewed carefully by our team.
The position is based in Bridgwater, England, United Kingdom.
This opportunity is part of our work in Engineering.
The advertised compensation is 55.000 - 75.000.