Assystem is seeking a Commissioning Planning Engineer for the HPC project, embedded in the Integrated Project Controls function. The role involves owning the Level 2/4 Integrated Work Schedule and coordinating across disciplines to keep the programme on track.
Hybrid working is offered with a base at HPC Bridgwater, and travel to the site will be required three days per week. Nuclear familiarity is a bonus for the right major programme background.
#J-18808-Ljbffr
This role, Hybrid Commissioning Planning Engineer - Nuclear Project at Assystem, could be your next move.
If your experience matches this role, we encourage you to apply.
All applications are reviewed carefully by our team.
The position is based in Newport, Wales, United Kingdom.
This opportunity is part of our work in Engineering.
The advertised compensation is 60.000 - 85.000.