The Launch Group seeks an experienced CSA Lead for an on-site role on a major European data centre project. You will oversee Civil, Structural, and Architectural activities, manage a large CSA team and coordinate design with subcontractors from concept to handover.
You will lead reporting, project controls, and safety culture while ensuring cost, schedule and quality targets are met across the project lifecycle.
#J-18808-Ljbffr
We are looking to fill the Senior CSA Lead - Data Centre Construction (On-site Europe) position at The Launch Group in Blyth, England, United Kingdom.
The position is based in Blyth, England, United Kingdom.
This opportunity is part of our work in Engineering.
The advertised compensation is 77.000 - 120.000.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.