V.Group is seeking a 3rd Engineer for their Windfarm Installation Unit. This contract position is offshore aboard windfarm support vessels under the Engine department, and focuses on essential engineering tasks for installation activities.
Joining date window is 16 December 2026 through 6 January 2027, with a duration of about three weeks to one month. Experience on WTIV or jack-up rigs and GWO W@H/SS, Safe Transfer by Boat, HUET/CAEBS certificates are required.
#J-18808-Ljbffr
We are seeking a motivated Offshore Windfarm Installation Engineer (3rd) – Shipboard to join V.Group in Greater London, England, United Kingdom.
We invite applications for the Offshore Windfarm Installation Engineer (3rd) – Shipboard position located in Greater London, England, United Kingdom.
The following role is for a Offshore Windfarm Installation Engineer (3rd) – Shipboard with V.Group.
Our group is growing, and we are hiring a Offshore Windfarm Installation Engineer (3rd) – Shipboard in Greater London, England, United Kingdom.